The Walsh Bay redevelopment project in Sydney is a grand scale project tasked to revitalise one of the most culturally significant precincts on the Australian arts and live performance scene. The precinct consists of a network of wharves, piers and warehouses dating back 100 years, many in a state of decline and requiring an architectural and networking overhaul to house Australia’s more prestigious theatre, dance and symphonic companies. The redevelopment extended beyond providing world class performance venues and auditorium facilities for globally reputed performance troupes to ensure a visitor experience including the visual and audio encounters exceeded global expectations.

The project was awarded to Richard Crookes Construction. Richard Crookes Construction engaged Fredon Industries as the contractor for the electrical, communication, HVAC, audio visual and security packages.

Through years of successful relationship and project management collaboration, Fredon turned to Optical Solutions Australia; OSA, to design, build and supply the ICN network across the development as a plug and play solution. OSA is the only organisation with the expertise and engineering skill sets to deliver on communications, racking and build an ICN network meeting all the complexities of the Walsh Bay redevelopment project.

OSA-Walsh-bay-arts-precinct-Sydney

Not without its challenges

The ICN network build was a complex design. The project encountered a number of variables within the multi layered construction incorporating an expanded portfolio of sub sections and building management systems (BMS) across a variety of tenant requirements and architectural complexities.

The network needed to deliver full scale CCTV, Access Control Points, emergency lighting, solar systems, internal and external lighting control, audio visual subsystems, paging systems, staging communications, architectural and theatrical lighting, holistic wireless connections and intercom.

The network design and build required extensive tenant consultation taking in consideration of the nuances and technical requirements of each tenant with added attention to the visitor experience. The build faces further challenges due to the advent of Covid-19 and the travel restrictions applied meant our engineers needed to assemble a highly secure remote access portal to replace onsite visitation. Additional architectural variations to the building’s layouts added unforeseen obstructions that required fast troubleshooting techniques to keep the projects forward momentum to meet the tenant’s timeframe expectations.

The system was designed, built and tested in the OSA laboratory at our Brisbane facility. Our team had the necessary experience, engineering skills and resources to complete the project off site and deliver to Fredon a ready to install turnkey plug and play solution. The Brisbane facility is a large purpose built laboratory hosting OSA highly experienced engineering team. It is here that much of the research and design development for OSA projects takes place. It is this level of capability and network engineering expertise that enables us to build the network hardware, test it, and ship it for a convenient end user installation that keeps OSA ahead of the competition and provides the turnkey solution packages for projects such as the Walsh Bay Redevelopment.

OSA-Challenges-in-ICN-Network

The ICN Network

The ICN network installed at Walsh Bay is a high speed state of the art network consisting of 10 Gigabit per second links between the latest technology Aruba (HPE) switches.

In addition to the switching infrastructure there is a world leading Aruba wireless network throughout the site.

The ICN network silently underpins the entire site.

The network design and build required extensive tenant consultation taking in consideration of the nuances and technical requirements of each tenant with added attention to the visitor experience. The build faces further challenges due to the advent of Covid-19 and the travel restrictions applied meant our engineers needed to assemble a highly secure remote access portal to replace onsite visitation. Additional architectural variations to the building’s layouts added unforeseen obstructions that required fast troubleshooting techniques to keep the projects forward momentum to meet the tenant’s timeframe expectations.

The system was designed, built and tested in the OSA laboratory at our Brisbane facility. Our team had the necessary experience, engineering skills and resources to complete the project off site and deliver to Fredon a ready to install turnkey plug and play solution. The Brisbane facility is a large purpose built laboratory hosting OSA highly experienced engineering team. It is here that much of the research and design development for OSA projects takes place. It is this level of capability and network engineering expertise that enables us to build the network hardware, test it, and ship it for a convenient end user installation that keeps OSA ahead of the competition and provides the turnkey solution packages for projects such as the Walsh Bay Redevelopment.

OSA-ICT-Network

What is next?

“Without the support Richard Candrick and Graham Brown and their teams we would not have met the tight deadlines on this project.

Their ethics and commitment and logical approach in the following assisted with a
successful completion.

  • Engineering and documentation requirements
  • Solid in communication with us and our client
  • Deliverables to site on time
  • Teams committed to resolving issues in a timely manner and delivering a system
  • that performed without any issue during commissioning and handover to our client.
  • Availability to technicians to site

I would highly recommend OSA as a services provider to potential Clients”

Mr. Phil Edwards Project Manager - Fredon Industries Pty Limited

The Walsh Bay pier 4/5 is now complete and its world leading facilities including administration, performance staging, theatres, rehearsal studios, visitor and patron experiences, bars, restaurants, visual, audio, and communication infrastructure have seen the successful integration and relocation of some of Australia’s most prestigious companies including:

  • The Sydney Theatre Company
  • The Sydney Dance Company
  • The Bangarra Dance Company
  • The Sydney Philharmonia Choir
  • The Gondwana Choir
  • The Song Company
  • Bell Shakespeare
  • Australian Chamber Orchestra
  • Australian Theatre for Young People.

The venues are also home to the Sydney Writers’ festival and Biennale.

Richard Crookes Construction, Fredon Industries and Optical Solutions Australia are now preparing the next phase of pier 2/3 remodelling. OSA are excited about the continued involvement with this nationally and internationally significant project.

Walsh_Bay_Arts_Wharf_1_Arthur_Vay

Speak to our team of experts

Here at OSA, we can help determine exactly what your business networking requirements are, to ensure your network is working at its optimum level, whilst mitigating risk. When you are ready to upgrade your system or simply need some advice, contact us today for a no obligation chat.

More Case Studies

  • Allianz Stadium Project
    The Allianz Stadium in Moore Park is a major piece of sporting infrastructure. Located next to the iconic Sydney Cricket Ground, Allianz Stadium repla...
  • Testing Solutions – A Milestone Project
    OSA continues to over deliver on customer based infrastructure testing. Using global leading technologies and advanced collaboration techniques our te...
  • Networking challenges at Herston Quarter
    OSA finds the ideal networking solution for even the most challenging projects. We completed a major engineering services network installation for Que...
  • Supplying robust solutions for EastLink
    When EastLink came to OSA searching for the best network solutions for the tollway’s extensive CCTV network, we knew exactly what products and appli...
  • Supporting MDE Group’s project for Property NSW
    For MDE Group, the need for quality communications and electrical services and products is essential. Using reliable data centre cabling and fibre opt...
  • FIBIC’s new EXFO FTBs and Sumitomo splicers
    FIBIC required reliable test and measurement equipment and splicers to achieve success across all projects. They relied on OSA’s expertise and custo...
  • Manuka Oval Media and Function Centre
    Thousands of people were on the edge of their seats, enjoying a cricket showdown. The International Test Match 2019 made history – it was held at th...
  • Italian Aged Care Inc. Construction
    Italian Aged Care Incorporated (IACI) came to NCIS Group looking for a network solution capable of providing the highest level of residential care ser...
  • Korenix Verticals
    Korenix Technology’s high-quality wired and wireless networking solutions deliver reliable industrial networks for a range of vertical markets, incl...
  • Western Sydney Stadium
    The new Western Sydney Stadium is part of the NSW Government’s initiative to improve sporting infrastructure across the State. The new stadium will ...
  • Blacktown Hospital Redevelopment
    When Stowe Australia won the tender to install the complete electrical and communications services for the Blacktown Hospital Redevelopment, they need...
  • Linktech Upgrade their Fleet to EXFO OTDRs
    In partnership with EXFO, OSA transition Linktech’s ageing optical test and measurement fleet to a state of the art, scalable and innovative fleet o...